Search results

Filters

  • Journals
  • Authors
  • Keywords
  • Date
  • Type

Search results

Number of results: 1
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

BIM technology is not commonly used in the Polish bridge engineering yet. The article presents a case study of a road bridge made of prestressed concrete and built using the incremental launching method, modelled according to the BIM technology. The bridge with a complex geometry is located along the S1 expressway. Particular attention is paid to the development of the BIM 5D model created on the basis of a design developed traditionally in order to gain competence and verify the set goals. The process of creating subsequent stages of the BIM model is characterized synthetically, in particular the 3D geometric model with the surrounding area and additional 4D (time) and 5D (costs, kinds of materials) dimensions together with the software used. The article discusses the assumptions adopted for the development of numerical models and data analyses. The developed models take into account the assembly phase (construction) and the use (operation) phase, appropriate for the incremental launching method. The results obtained while using BIM technology were confronted with the results identified on the basis of a conventional design. Conclusions present the most important challenges and the achieved goals as well as the pros and cons of creating designs while using BIM technology.
Go to article

Authors and Affiliations

Wojciech Trochymiak
1
ORCID: ORCID
Artur Krygier
2
ORCID: ORCID
Michał Stachura
2
Jakub Jaworski
3

  1. Warsaw University of Technology, Faculty of Civil Engineering, Al. Armii Ludowej 16,00-637 Warsaw, Poland
  2. PORR S.A., ul. Hołubcowa 123, 02-854 Warsaw, Poland
  3. BHJ-Inzynieria Sp. z o.o., ul. Gustawa Herlinga-Grudzinskiego 19E/6, 80-283 Gdansk, Poland

This page uses 'cookies'. Learn more