@ARTICLE{Trochymiak_Wojciech_The_2023, author={Trochymiak, Wojciech and Krygier, Artur and Stachura, MichaƂ and Jaworski, Jakub}, volume={vol. 69}, number={No 3}, journal={Archives of Civil Engineering}, pages={157-172}, howpublished={online}, year={2023}, publisher={WARSAW UNIVERSITY OF TECHNOLOGY FACULTY OF CIVIL ENGINEERING and COMMITTEE FOR CIVIL ENGINEERING POLISH ACADEMY OF SCIENCES}, abstract={BIM technology is not commonly used in the Polish bridge engineering yet. The article presents a case study of a road bridge made of prestressed concrete and built using the incremental launching method, modelled according to the BIM technology. The bridge with a complex geometry is located along the S1 expressway. Particular attention is paid to the development of the BIM 5D model created on the basis of a design developed traditionally in order to gain competence and verify the set goals. The process of creating subsequent stages of the BIM model is characterized synthetically, in particular the 3D geometric model with the surrounding area and additional 4D (time) and 5D (costs, kinds of materials) dimensions together with the software used. The article discusses the assumptions adopted for the development of numerical models and data analyses. The developed models take into account the assembly phase (construction) and the use (operation) phase, appropriate for the incremental launching method. The results obtained while using BIM technology were confronted with the results identified on the basis of a conventional design. Conclusions present the most important challenges and the achieved goals as well as the pros and cons of creating designs while using BIM technology.}, type={Article}, title={The BIM 5D model of the bridge built using the incremental launching method}, URL={http://www.czasopisma.pan.pl/Content/128459/PDF-MASTER/art10_int.pdf}, doi={10.24425/ace.2023.146073}, keywords={BIM, incremental launching method, BIM 5D model, posttensioning concrete, road bridge}, }