Abstract

This issue is a typical NP-hard problem for an unrelated parallel machine scheduling problem with makespan minimization as the goal and no sequence-related preparation time. Based on the idea of tabu search (TS), this paper improves the iterative greedy algorithm (IG) and proposes an IG-TS algorithm with deconstruction, reconstruction, and neighborhood search operations as the main optimization process. This algorithm has the characteristics of the strong capability of global search and fast speed of convergence. The warp knitting workshop scheduling problem in the textile industry, which has the complex characteristics of a large scale, nonlinearity, uncertainty, and strong coupling, is a typical unrelated parallel machine scheduling problem. The IG-TS algorithm is applied to solve it, and three commonly used scheduling algorithms are set as a comparison, namely the GA-TS algorithm, ABC-TS algorithm, and PSO-TS algorithm. The outcome shows that the scheduling results of the IG-TS algorithm have the shortest manufacturing time and good robustness. In addition, the production comparison between the IG-TS algorithm scheduling scheme and the artificial experience scheduling scheme for the small-scale example problem shows that the IG-TS algorithm scheduling is slightly superior to the artificial experience scheduling in both planning and actual production. Experiments show that the IG-TS algorithm is feasible in warp knitting workshop scheduling problems, effectively realizing the reduction of energy and the increase in efficiency of a digital workshop in the textile industry.
Go to article

Authors and Affiliations

Xinfu Chi
1
ORCID: ORCID
Shijing Liu
1
Ce Li
1

  1. Dong Hua University, College of Mechanical Engineering, Shanghai 201620, China
Download PDF Download RIS Download Bibtex

Abstract

We consider the real-life problem of planning tasks for teams in a corporation, in conditions of some restrictions. The problem takes into account various constraints, such as for instance flexible working hours, common meeting periods, time set aside for self-learning, lunchtimes and periodic performance of tasks. Additionally, only a part of the team may participate in meetings, and each team member may have their own periodic tasks such as self-development. We propose an algorithm that is an extension of the algorithm dedicated for scheduling on parallel unrelated processors with the makespan criterion. Our approach assumes that each task can be defined by a subset of employees or an entire team. However, each worker is of a different efficiency, so task completion times may differ. Moreover, the tasks are prioritized. The problem is NP-hard. Numerical experiments cover benchmarks with 10 instances of 100 tasks assigned to a 5-person team. For all instances, various algorithms such as branch-and-bound, genetic and tabu search have been tested.
Go to article

Authors and Affiliations

Marek Bazan
1 2
Czesław Smutnicki
1
Maciej E. Marchwiany
2

  1. Wroclaw University of Scienceand Technology, Department of Computer Engineering, Wrocław, Poland
  2. JT Weston sp. z o.o. Warszawa, Poland