Search results

Filters

  • Journals
  • Authors
  • Keywords
  • Date
  • Type

Search results

Number of results: 2
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

In order to study the sensitivity of multiple karst cave factors on surface settlement during Tunnel Boring Machine(referred to TBM hereinafter) tunnelling, a three-dimensional numerical model is built by taking a subway project as an example and combining MIDAS GTS NX finite element software. Secondly, the influence of the radius, height, angle, vertical net distance, and horizontal distance of the karst cave on the maximum surface settlement is studied and sorted under the two working conditions of treatment and untreated using the grey correlation analysis method. Additionally, a multi-factor numerical model of the untreated karst cave is established. Finally, based on the preceding research, a multi-factor prediction model for the maximum surface settlement is proposed and tested. The results reveal that when the karst cave is not treated, the radius and height of the karst cave have a significant effect on the maximum surface settlement. After the cave treatment, the influence of the cave parameters on the maximum settlement of the surface is greatly reduced. The calculating modelcreated in this study offers excellent prediction accuracy and good adaptability.
Go to article

Authors and Affiliations

Bichang Dong
Tao Yang
ORCID: ORCID
Binbin JU
Zhongying QU
Chao Yi
Download PDF Download RIS Download Bibtex

Abstract

There are several large karst caves at haunch part of the Lidong Tunnel during construction, together with inrush water due to high pressure within these caves. In light of it, this paper takes YK342+113 section as an example and adopts finite difference software FLAC 3D, so as to analyze tunnel deformation when crossing karst caves under six different working conditions, including with or without karst cave, before and after karst treatment, along with support locations. According to analysis results: First, the wall rock mainly had deformation at tunnel vault when evacuating at the third bench, which is a critical monitoring focus for tunnel construction; Second, karst cave treatment contributed to better conduct forces on both sides of wall rock, thus reducing vault settlement, while not affecting horizontal convergence and upturn of vaults; Third, treatment measures were proved to be effective in minimizing wall rock deformation by comparing deformation curves under different conditions; Fourth, after treatment measures, the angular points within the cave’s chamber had stress concentration, which might cause secondary collapse. Field monitoring data revealed that the final settlement of the tunnel vault was relatively consistent with the numerical analysis results, with a distinct change in daily settlement after initial support construction. By integrating numerical analysis and field monitoring, the rationality of the karst treatment plan was fully verified, providing a valuable reference for similar projects.
Go to article

Authors and Affiliations

Kai Zhu
1
ORCID: ORCID
Kui Zhang
2
ORCID: ORCID
Xiang-Dong Wu
3
ORCID: ORCID
Xiang-Ge Chen
4 5
ORCID: ORCID

  1. Guangdong Nanyue Transportation Investment and Construction Co., Ltd, Guangzhou 510199, China
  2. Shenzhen ExpresswayOperation andDevelopmentCo., Ltd, Shenzhen 518110,China
  3. Poly ChangDa Engineering Co., Ltd, Guangzhou 510620, China
  4. Chongqing Jiaotong University, School of Civil Engineering, Chongqing 400074, China
  5. State Key Laboratory of Mountain Bridge and Tunnel Engineering, Chongqing 400074, China

This page uses 'cookies'. Learn more