Search results

Filters

  • Journals
  • Authors
  • Keywords
  • Date
  • Type

Search results

Number of results: 2
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

A method of creating production schedules regarding production lines with parallel machines is presented. The production line setup provides for intermediate buffers located between individual stages. The method mostly concerns situations when part of the production machines is unavailable for performance of operations and it becomes necessary to modify the original schedule, the consequence of which is the need to build a new schedule. The cost criterion was taken into account, as the schedule is created with the lowest possible costs regarding untimely completion of products (e.g. fines for delayed product completion). The proposed method is relaxing heuristics, thanks to which scheduling is performed in a relatively short time. This was confirmed by the presented results of computational experiments. These experiments were carried out for the rescheduling of machine parts production.

Go to article

Authors and Affiliations

Marek Magiera
Download PDF Download RIS Download Bibtex

Abstract

One of the most popular heuristics used to solve the permutation flowshop scheduling problem (PFSP) is the NEH algorithm. The reasons for the NEH popularity are its simplicity, short calculation time, and good-quality approximations of the optimal solution for a wide range of PFSP instances. Since its development, many works have been published analysing various aspects of its performance and proposing its improvements. The NEH algorithm includes, however, one unspecified and unexamined feature that is related to the order of jobs with equal values of total processing time in an initial sequence. We examined this NEH aspect using all instances from Taillard’s and VRF benchmark sets. As presented in this paper, the sorting operation has a significant impact on the results obtained by the NEH algorithm. The reason for this is primarily the input sequence of jobs, but also the sorting algorithm itself. Following this observation, we have proposed two modifications of the original NEH algorithm dealing with sequencing of jobs with equal total processing time. Unfortunately, the simple procedures used did not always give better results than the classical NEH algorithm, which means that the problem of sequencing jobs with equal total processing time needs a smart approach and this is one of the promising directions for further research.
Go to article

Authors and Affiliations

Radosław Puka
1
Jan Duda
1
A. Stawowy
ORCID: ORCID

  1. Bialystok University of Technology, Faculty of Management Engineering, Poland

This page uses 'cookies'. Learn more