Search results

Filters

  • Journals
  • Authors
  • Keywords
  • Date
  • Type

Search results

Number of results: 3
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

The fact that mines have to be established at the place where they are located without having a chance to choose a location brings out area usage conflicts with areas that need to be protected. In fact, forestlands are most common in these overlapping areas in Turkey. In order to perform mining activities in this overlapping forestlands, mining enterprises in Turkey receive forest land permit fees (FLPF), reforestation fees, rehabilitation fees + security deposit of conformity to the environment (SDCE), and other fees. In order to determine the share of these costs in mining investments and operating costs (OC) and to bring a solution proposal so that these costs do not pose a risk of loss of the investment in the mining enterprises, questions have been asked to mining enterprises within Turkey using the “Survey Monkey” program. The averages of all forest fees determined from the answers are proportioned to the mining investment amounts (MIA) and the annual average OC of each mining company responding to the Survey.

Thus, the distribution criteria of different forest fees that are required to be paid by the mining enterprises in order to carry out mining operations in the forestlands in Turkey and their distribution on the basis of mineral groups were analyzed. In this calculation, it was suggested that all the fees in Turkey should be reduced to a more reasonable degree by suggesting solutions regarding the calculation method envisaged by the FLPF, which has a very high share. Otherwise, the result of these rates shows that the costs of forest land-use for mining stipulated by the legislation in Turkey are quite high compared to other countries, and that the current mining investments can have difficulty in maintaining their economic operability in the presence of these required costs.

Go to article

Authors and Affiliations

Taşkın Deniz Yildiz
Download PDF Download RIS Download Bibtex

Abstract

The demand for REE was the background to include them to those consisting of the property of the State Treasury in Poland, enumerated in the Geological and Mining Law (Article 10). The PLN 500/kg REE payment for exploitation of REE (exploitation tax) was introduced. Both proposals will restrain the REE recovery from exploited domestic mineral commodities. The term REE is imprecise. Their deposits are rare and may be classified as “REE ore deposits”. The REE are often the accompanying constituents in varied mineral commodities and are recoverable during their processing, outside the mine. The application of an exploitation tax in such a case is inapplicable. The established value of the exploitation tax is incomparably high in respect to the value of the REE contained in mined mineral commodities. The analysis of introduced changes of mining and geological law allow to suggest the reevaluation of ownership based subdivision of mineral commodities: name the mineral commodities belonging to the land property owners and leave the list of mineral commodities consisting property of the State Treasury open. The more careful approach is also necessary in the formulation of Geological and Mining Law. It should be preliminary formulated by persons competent in geology and mining and subsequently adjusted to juridical exigencies.

Go to article

Authors and Affiliations

Marek Nieć
Download PDF Download RIS Download Bibtex

Abstract

Irrigation network maintenance is very important to ensure the function of irrigation run well. Therefore, maintenance fee is necessary to maintain the irrigation network. The problem is the maintenance cost of irrigation network is expensive, the second highest cost after rehabilitation costs. Thus, participation of farmers in irrigation network maintenance is essential. One of participation by farmers is in the form of regular fees. This study aims to determine the number of fees farmers are willing to pay to maintain irrigation networks through the willingness-to-pay approach. This study was conducted in the irrigation area of the Gonggang reservoir in Magetan District. The subject is farmers who use irrigation – the data collection technique used by observation, interview, questionnaire, and documentation. The data analysis technique used is the contingent valuation method with steps (1) determining the hypothetical market, (2) obtaining bids, (3) estimating average willingness to pay, (4) estimating bid curves, and (5) aggregating data. The result shows that the amount of farmers’ willingness to pay the maintenance fees for irrigation networks at Gonggang reservoir irrigation area in Magetan District by using the contingent valuation method is IDR 90,621 (USD 5.45) for each hectare for each planting period with total willingness to pay in the population of IDR 116,188,708 (USD 7,951.59) for each planting period.
Go to article

Authors and Affiliations

Cindy Puspitasari
1
ORCID: ORCID
Joko Sutrisno
1
ORCID: ORCID
Ernoiz Antriyandarti
1
ORCID: ORCID

  1. Universitas Sebelas Maret, Faculty of Agriculture, Study Program of Agribusiness, Jalan Ir. Sutami 36 57126 Surakarta, Central Java, Indonesia

This page uses 'cookies'. Learn more