Search results

Filters

  • Journals
  • Authors
  • Keywords
  • Date
  • Type

Search results

Number of results: 1
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

The caving effect of the top coal caving is crucial for efficient mining. Using the Yushuling coal mine, Xinjiang province, China, as a case study, the coal and rock physical and mechanical parameters, such as the compressive, tensile, and shear strength values and hardness of the top coal and roof rock, were determined. The analysis of the effect of different factors on the blasting presplitting process was numerically simulated, and the optimal parameters of blast drilling were identified. Three presplit boreholes were implemented: in the workface, the workface’s advance area, and the two roadway roofs in the workface’s advance area. The optimal blasting drilling parameters and charge structure were designed. The field test results in the mine under study indicated that the top coal recovery rate of the 110501 fully mechanised top coal caving face was improved twice (from 40 to more than 80%), and an effective blasting presplitting was achieved. The proposed blasting presplitting method has an important guiding significance for fully mechanised top coal caving mining in Xinjiang and similar mining areas.
Go to article

Authors and Affiliations

Qiang Sun
1
ORCID: ORCID
Chengfang Shan
2
ORCID: ORCID
Zhongya Wu
1
ORCID: ORCID
Yunbo Wang
1
ORCID: ORCID

  1. China University of Mining and Technology, China
  2. Kuqa Yushuling Coal Mine Co., Ltd, Kuqa, Aksu, China

This page uses 'cookies'. Learn more