Search results

Filters

  • Journals
  • Authors
  • Keywords
  • Date
  • Type

Search results

Number of results: 5
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

The bridge horizontal swivel system generally adopts a symmetrical structure and uses a spherical hinge structure that can adjust the rotation to complete rotation construction. Because of the complexity of railway lines under bridges, some asymmetrical horizontal swivel systems have been increasingly applied in practical engineering in recent years. This system is more suitable for areas with complex railway lines, reduces the bridge span, and provides better economic benefits. However, it is also extremely unstable. In addition, instability can easily occur under dynamic loads, such as earthquake action and pulsating wind effects. Therefore, it is necessary to study their mechanical behavior. Based on the horizontal swivel system of an 11,000-ton asymmetric continuous girder bridge, the dynamic response of the horizontal swivel system to seismic action was studied using the finite element simulation analysis method. Furthermore, using the Peer database, seismic waves that meet the calculation requirements are screened for time-history analysis and compared to the response spectrum method. The mechanical properties of the structural system during and after rotation were obtained through calculations. During rotation, the seismic response of the structure is greater. To reduce the calculation time cost, an optimization algorithm based on the mode shape superposition method is proposed. The calculation result is 87% that of the time-history analysis, indicating a relatively high calculation accuracy.
Go to article

Authors and Affiliations

Jiawei Wang
1
ORCID: ORCID
Hongshuai Gao
2
ORCID: ORCID
Kexin Zhang
3
ORCID: ORCID
Zongyun Mo
1
ORCID: ORCID
Hongchun Wang
1
ORCID: ORCID

  1. Anhui Polytechnic University, School of Architecture and Civil Engineering, Wuhu City, Beijing Middle Road, China
  2. Heilongjiang University, College of Civil Engineering, Harbin City, Xuefu Road, China
  3. Shenyang Jianzhu University, School of Architecture and Civil Engineering, Shenyang City, Hun Nan Road, China
Download PDF Download RIS Download Bibtex

Abstract

Two-way curved arch bridges inherit the fine tradition of masonry structures, making full use of the advantages of prefabricated assembly, it adapts to the situation of no support construction and no large lifting machine and tools, and has the characteristics of convenient construction method and saving material consumption. In appearance, the two-way curved arch bridge has strong national cultural characteristics. The prefabricated components of the two-way curved arch bridge are fragmentary, complicated in bearing and poor in integrity. Most of the two-way curved arch bridges in service have been built for a long time and lack of maintenance and management. Increasing the cross-section reinforcement method is one of the two-way curved arch reinforcement methods. It has a significant effect, convenient construction, good rigidity and stability characteristics after the reinforcement. Through theoretical analysis, combined with a static load test results of the assessment of the bridge reinforcement effect. Through load test, it is found that the deflection of the arch rib after reinforcement is reduced by 9%~19% and the strain of the arch rib is reduced by 12%~22%. Through finite element calculation, the crack width of the reinforced arch rib decreases by 8.3%~14.2%. The results show that the stress and deflection are greatly improved by the method of increasing section.
Go to article

Authors and Affiliations

Kexin X. Zhang
1
ORCID: ORCID
Tianyu Y. Qi
2
ORCID: ORCID
Xingwei W. Xue
1
ORCID: ORCID
Yanfeng F. Li
1
ORCID: ORCID
Zhimin M. Zhu
3
ORCID: ORCID

  1. PhD., Eng., Shenyang Jianzhu University, School of Traffic Engineering, No. 25 Hunnan Zhong Road, Hunnan District, 110168 Shenyang, China
  2. Master Degree Candidate, Shenyang Jianzhu University, School of Traffic Engineering, No. 25 Hunnan Zhong Road, Hunnan District, 110168 Shenyang, China
  3. Master, Liaoning Urban Construction Design Institute Co. LTD, Shenyang, No.77-1 Jinfeng Street, Shenyang, China
Download PDF Download RIS Download Bibtex

Abstract

Concrete-filled steel tube arch bridge is filled with concrete inside the steel tube. The radial constraint of the steel tube limits the expansion of the compression concrete, which makes the concrete in the three-way compression state, thus significantly improving the compressive strength of the concrete. At the same time, it can simplify the construction process and shorten the construction period. Since the rapid development of concretefilled steel tubular tied arch bridge in the 1990s, a large number of such Bridges have suffered from the defects of steel concrete, loose tie rod, and hanger rod rust, etc. Therefore, the reinforcement technology for various diseases has been studied, among which the reinforcement technology for hanger rod replacement is the most complicated and more difficult. As more and more bridges of this type enter the period of reinforcement, it ismore and more urgent to study the reinforcement technology of suspenders. Taking a bridge that has been in service for 23 years as an example, this paper discusses the construction method and construction monitoring of replacing the suspender, so as to guide the construction monitoring of the bridge. Finally, the construction monitoring results of the bridge are given, which can provide reference for the replacement of the suspender of this type of bridge.
Go to article

Authors and Affiliations

Kexin X. Zhang
1
ORCID: ORCID
Tianyu Y. Qi
2
ORCID: ORCID
Xingwei W. Xue
1
ORCID: ORCID
Yanfeng F. Li
1
ORCID: ORCID
Zhimin M. Zhu
3
ORCID: ORCID

  1. PhD., Eng., Shenyang Jianzhu University, School of Traffic Engineering, No. 25 Hunnan Zhong Road, Hunnan District, 110168 Shenyang, China
  2. Master Degree Candidate, Shenyang Jianzhu University, School of Traffic Engineering, No. 25 Hunnan Zhong Road, Hunnan District, 110168 Shenyang, China
  3. Master, Liaoning Urban Construction Design Institute Co. LTD, Shenyang, No.77-1 Jinfeng Street, Shenyang, China
Download PDF Download RIS Download Bibtex

Abstract

Since the establishment of the People’s Republic of China, the country has made significant progress in tunnel construction, transforming from a “weak tunnel nation” to a “strong tunnel nation.” As of 2022, China has undertaken more than 60 projects involving large-diameter shield tunnels. To promote the sustainable and high-quality development of large-diameter shield tunnels in China, this article systematically reviews the development history of large-diameter shield tunnels, summarizes the current projects in the country, and addresses various aspects such as construction technology management, design technology, ecological conservation, safety, and intelligence. The article also provides suggestions for the development of large-diameter shield tunnels in China, with the aim of playing a proactive role in promoting their advancement.
Go to article

Authors and Affiliations

Wei Qiu
1
ORCID: ORCID
Xin Dong
1
ORCID: ORCID
Linjian Su
1
ORCID: ORCID
Xingwei Xue
2
ORCID: ORCID
Kexin Zhang
2
ORCID: ORCID

  1. Engineering Department, Guangzhou Expressway Co., LTD, China
  2. School of Transportation and Surveying Engineering, Shenyang Jianzhu University, China
Download PDF Download RIS Download Bibtex

Abstract

In order to obtain the change rule of surrounding rock structure displacement and supporting structure internal force with time during the construction of the low mountain ridge tunnel, this paper relies on the Xishan Tunnel Project as the background. During tunneling, the displacement around the tunnel, the subsidence of the surface, the internal force of the steel arch and the pressure between the two layers of support are monitored dynamically. According to the above monitoring and measurement data, and the monitoring data analysis and nonlinear regression fitting, the predicted trend curve is obtained, the displacement change rules and characteristics of various surrounding rocks of the tunnel are obtained, to ensure the construction safety and stability requirements of supporting structure, and to provide a reasonable opportunity for the construction of secondary lining.
Go to article

Authors and Affiliations

Jian Ouyang
1
ORCID: ORCID
Haijun Wang
1
ORCID: ORCID
Luxiang Wu
1
ORCID: ORCID
Kexin Zhang
2
ORCID: ORCID
Xingwei Xue
2
ORCID: ORCID

  1. Engineering Department, Guangzhou Expressway Co., LTD, China
  2. School of Transportation and Surveying Engineering, Shenyang Jianzhu University, China

This page uses 'cookies'. Learn more