Search results

Filters

  • Journals
  • Authors
  • Keywords
  • Date
  • Type

Search results

Number of results: 4
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

The paper presents a Car Sequencing Problem, widely considered in the literature. The issue considered by the researchers is only a reduced problem in comparison with the problem in real automotive production. Consequently, a newconcept, called Paint Shop 4.0., is considered from the viewpoint of a sequencing problem. The paper is a part of the previously conducted research, identified as Car Sequencing Problem with Buffers (CSPwB), which extended the original problem to a problem in a production line equipped with buffers. The new innovative approach is based on the ideas of Industry 4.0 and the buffer management system. In the paper, sequencing algorithms that have been developed so far are discussed. The original Follow-up Sequencing Algorithm is presented, which is still developed by the authors. The main goal of the research is to find the most effective algorithm in terms of minimization of painting gun changeovers and synchronization necessary color changes with periodic gun cleanings. Carried out research shows that the most advanced algorithm proposed by the authors outperforms other tested methods, so it is promising to be used in the automotive industry.

Go to article

Authors and Affiliations

Sara Bysko
Jolanta Krystek
Szymon Bysko
Radim Lenort
Download PDF Download RIS Download Bibtex

Abstract

Abstract Underground extraction of coal is characterized by high variability of mining and geological conditions in which it is conducted. Despite ever more effective methods and tools, used to identify the factors influencing this process, mining machinery, used in mining underground, work in difficult and not always foreseeable conditions, which means that these machines should be very universal and reliable. Additionally, a big competition, occurring on the coal market, causes that it is necessary to take action in order to reduce the cost of its production, e.g. by increasing the efficiency of utilization machines. To meet this objective it should be pro-ceed with analysis presented in this paper. The analysis concerns to availability of utilization selected mining machinery, conducted using the model of OEE, which is a tool for quantitative estimate strategy TPM. In this article we considered the machines being part of the mechanized longwall complex and the basis of analysis was the data recording by the industrial automation system. Using this data set we evaluated the availability of studied machines and the structure of registered breaks in their work. The results should be an important source of information for maintenance staff and management of mining plants, needed to improve the economic efficiency of underground mining.
Go to article

Authors and Affiliations

Jarosław Brodny
Sara Alszer
Jolanta Krystek
Magdalena Tutak
Download PDF Download RIS Download Bibtex

Abstract

This paper presents a concept of an Integrated System of Supporting Information Management in Passenger Traffic (ISSIMPT). The novelty of the system is an integration of six modules: video monitoring, counting passenger flows, dynamic information for passengers, the central processing unit, surveillance center and vehicle diagnostics into one coherent solution. Basing on expert evaluations, we propose to present configuration design problem of the system as a multi-objectives discrete static optimization problem. Then, hybrid method joining properties of weighted sum and ε-constraint methods is applied to solve the problem. Solution selections based on hybrid method, using set of exemplary cases, are shown.
Go to article

Authors and Affiliations

Adam Galuszka
Jolanta Krystek
Andrzej Swierniak
Carmen Lungoci
Tomasz Grzejszczak

This page uses 'cookies'. Learn more