Abstract
The hydraulic fill method of erecting dams was characterized. The main assumptions and practical aspects of sand spigot were discussed on the example of the spigot of the dam body of the Zelazny Most Tailings Storage Facility (TSF). The advantages and disadvantages of the method are discussed, and the directions of attempts to implement pipelines rising along with sedimenting waste are presented, which are to reduce earthworks.
Go to article