Search results

Filters

  • Journals
  • Authors
  • Keywords
  • Date
  • Type

Search results

Number of results: 1
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

In order to obtain the change rule of surrounding rock structure displacement and supporting structure internal force with time during the construction of the low mountain ridge tunnel, this paper relies on the Xishan Tunnel Project as the background. During tunneling, the displacement around the tunnel, the subsidence of the surface, the internal force of the steel arch and the pressure between the two layers of support are monitored dynamically. According to the above monitoring and measurement data, and the monitoring data analysis and nonlinear regression fitting, the predicted trend curve is obtained, the displacement change rules and characteristics of various surrounding rocks of the tunnel are obtained, to ensure the construction safety and stability requirements of supporting structure, and to provide a reasonable opportunity for the construction of secondary lining.
Go to article

Authors and Affiliations

Jian Ouyang
1
ORCID: ORCID
Haijun Wang
1
ORCID: ORCID
Luxiang Wu
1
ORCID: ORCID
Kexin Zhang
2
ORCID: ORCID
Xingwei Xue
2
ORCID: ORCID

  1. Engineering Department, Guangzhou Expressway Co., LTD, China
  2. School of Transportation and Surveying Engineering, Shenyang Jianzhu University, China

This page uses 'cookies'. Learn more